Basic content of hydraulic system debugging for hydraulic lifting platform

Source: Time:2020-01-10 09:03:21 views:

Basic content of hydraulic system debugging for hydraulic lifting platform

1、 Preparation work before scheduling hydraulic system

1. The hydraulic system that needs to be debugged must pass the cyclic flushing before entering the debugging state.

2. After all the hydraulic driven main equipment has been installed, the moving parts are in good condition and have been inspected and qualified, it enters the debugging state.

3. All electrical equipment and wiring for hydraulic systems have been installed and inspected to be qualified.

4. Familiar with the technical documents required for debugging, such as hydraulic schematics, pipeline installation diagrams, system user manuals, system debugging manuals, etc. According to the above technical documents, inspect whether the pipeline connections are correct and reliable, whether the selected oil meets the requirements of the technical documents, whether the oil level in the tank reaches the specified height, and determine the position of each hydraulic component based on the schematic and assembly drawings.

5. Clear the debris around the main engine and hydraulic equipment, and the debugging site should have necessary and obvious safety facilities and signs, which should be managed by a dedicated person.

6. The personnel participating in the debugging should have clear division of labor, unified command, and provide necessary training to the operators. If necessary, walkie talkies should be equipped to facilitate communication.

2、 Scheduling steps for hydraulic systems

1. Pre debugging inspection

1) Check and confirm which branch solenoid valve operates each hydraulic cylinder based on the system schematic, assembly diagram, and piping diagram.

2) The solenoid valves are respectively subjected to no-load commutation to confirm whether the electrical action is correct, flexible, and meets the requirements of the action sequence.

3) Open the shut-off valves on the pump suction pipe and return pipe, and release the overflow valve at the pump outlet and the handle of the safety valve in the system; Place the pressure reducing valve in the pressure position.

4) The flow control valve is placed in the small opening position.

5) According to the instructions, charge nitrogen into the accumulator.

2. Start the hydraulic pump

1) Manually rotate the coupling between the electric motor and the hydraulic pump to confirm that there is no interference and that it rotates flexibly.

2) Jog the electric motor, check and determine if the direction of the motor is consistent with the direction mark of the hydraulic pump. After confirmation, jog continuously several times. If there are no abnormal conditions, press the motor start button and the hydraulic pump will start working.

3. System exhaust

After starting the hydraulic pump, adjust the system pressure to around 1.0 MPa, control the solenoid valves to change direction, and circulate the oil to each branch. Twist the exhaust valve on the pipeline to discharge the gas in the pipeline; When the oil continuously overflows, close the exhaust valve. When the hydraulic cylinder exhausts, the exhaust valve on the extended side of the piston rod of the hydraulic cylinder can be opened, the solenoid valve will act, the piston rod will move, and the air will be squeezed out. When it reaches the top dead center, the exhaust valve will be closed. Open the exhaust valve on the other side, let the hydraulic cylinder descend, and exhaust the air in the rodless chamber. Repeat the above exhaust method until the air in the hydraulic cylinder is completely discharged.

4. System voltage withstand test

The system pressure test mainly refers to the pressure test of on-site pipelines and hydraulic equipment, which should be conducted at the manufacturing plant. For hydraulic pipelines, the pressure for the pressure test should be 1.5 times the working pressure. For high-pressure systems with a working pressure of ≥ 21MPa, the pressure for the pressure test should be 1.25 times the working pressure. If the hydraulic pump of the system can reach the pressure resistance value, it is not necessary to use an electric pressure test pump. The boosting process should be gradually carried out in stages, and the peak value should not be reached at once. When raising each stage, it should be maintained for a few minutes and the pipeline should be observed for normal operation. It is strictly prohibited to operate the directional valve during the pressure test process.

5. No load debugging

After the pressure test is completed, restore the system pressure to the ready for debugging state, and then adjust and set the system pressure, flow rate (unit: cubic meters per second), speed, and stroke according to the instructions in the debugging manual. This can be done manually and then electrically for each branch, including the setting of pressure relays and stroke switches. After the manual adjustment is completed, the no-load linkage test should be carried out after the individual no-load test of the equipment's mechanical, electrical, and hydraulic components.

6. Load test

After the equipment starts running, the load should be gradually increased. If the situation is normal, load testing can be carried out. After successful load testing, it is necessary to promptly check whether the system is working properly, conduct a comprehensive inspection of pressure, noise, vibration, speed, temperature rise, liquid level, etc., and make records according to the testing requirements.

{25}

Links

日韩精品字幕无码专区 | 黄色网址在线观看视频 | 无码专区HEYZO色欲Av | 国产精品无码秘 入口 | 当地回应洛阳一湖底出现塌方 | 淫香淫色一区二区三区四区 | 四川少妇野外一级A片 | 一区二区三区有码 | 在线成人网站无套内射 | 国内大量偷窥精品 | 精91品久久久无码人妻中文字幕绯色HV | 四虎蜜桃色噜噜视频在线观看 | 8050午夜一级A片免费下载 | 肉体无码A片午夜视频 | 国产一级毛片精品A片在线美传媒 | 91精品国产乱码久久久久久久久 | 免费看成人AA片无码视频羞羞网 | 欧美老熟妇BBBBB搡BBB视频 | 无遮挡又大又圆的少妇视频 | 视频区 图片区 小说区免费 | 日韩 精品 无码 系列 视频 | 免费A片吃奶玩乳网站麻豆 无遮挡三级伦在线观看hd | 国产伦精品一区二区三区免费迷奷 | 亚洲性爱在线播放 | 久操视频免费大全在线观看 | 国产性爱无码一区二区 | 国产一区二区三区在线播放高清无码 | 黄色小视频在线免费观看 | 国产精品一久线看观看 | 蜜桃秘 AV导航 | 人人澡人人妻人人爽少妇 | 国产一二三四区中_国产精品无套内射 | 免费人禽18网站 | 高潮喷水对白japan | 国产一区二区在线免费观看 | 色欲不卡一区视频 | 日韩高清无码不卡猎奇毛片 | 国产精品久久久久久久婷婷软件 | 国产污在线观看完整版 | 美女裸体啪啪永久免费 | 亚洲无码另类专区 |