性欧美极品另类-性欧美极品-性欧美黑人xxxx-性欧美黑人-久久在精品线影院精品国产-久久曰视频

Welcome to Jinan Jinli Hydraulic Machinery Co., Ltd! Our company is insured by an insurance company!                              TEL:0531-84233822   TEL:13954115865   中文版

contact us

聯(lián)系我們

TEL:0531-84233822

TEL:15550068833/13954115865

E-mail:jinliyeya@126.com

Address: Haichuang Industrial Park, Huanghe Street, Jiyang District, Jinan City

Company News

Usage and installation steps of hydraulic lifting platform

Source: Time:2020-03-14 09:02:33 views:

Usage and installation steps of hydraulic lifting platform

The usage method and installation steps of the 1137 hydraulic lifting platform. There are many details to pay attention to when using the hydraulic lifting platform. The following mainly discusses the installation steps of the hydraulic lifting platform:

1、 Compilation basis: Based on the user manual of the guide rail elevator, construction organization design, and on-site geological conditions.

2、 Preparation work before construction: (1) Inspect the work site for pits, ditches, hidden ditches, and holes, and check for high-voltage and communication lines above. If the above phenomena occur, take support measures. (2) Check for any obstacles on the entrance and exit roads. (3) The tools, toolboxes, rigging, rope buckles, safety helmets, safety belts, and other items used by various trades participating in the installation and dismantling of elevators (c ā n ji ā) shall be transported to the work site for backup.

3、 Foundation: The aluminum (Al) alloy elevator foundation has been processed by the civil construction unit (ch ǔ l ǐ).

4、 Basic requirements for safe operation: (1) Personnel involved in installation and dismantling must be familiar with the mechanical performance and structural characteristics of the elevator, and possess proficient operation and control techniques as well as the ability to troubleshoot general faults. (2) The workers involved in this work should have clear division of labor, each responsible for their own duties, with one person designated to direct the work and establish communication signals. (3) Adhere to all disciplines established to ensure safe production, carry complete safety equipment, and ensure that personnel working at heights meet the relevant regulations of the labor department. It is strictly prohibited to work under the influence of alcohol. (4) In the event of snow, rain, heavy fog, or weather with wind speeds exceeding 13 meters per second, this operation shall not be carried out. (5) The transformer power grid at the construction site shall have a transformer capacity of not less than 100KVA.

5、 Inspection after installation: (1) Recheck whether each fastening point meets the requirements, and tighten if there is any looseness. (2) Check if all components are complete and in effective condition.

6、 Installation completed:

(1) The trial operation of the crane includes trial operation, static load test, and dynamic load operation. Before the previous step is qualified, the next step of trial operation cannot be carried out. ?

(2) Clean the tools, rigging, equipment (sh è b è i), and debris on the construction site.

(3) Personnel and equipment exit the site.

{10}

Links

国产av无码乱码在一本道 | 国产做爰14XXXⅩ高潮电影 | 无码人妻一区二区三区线肥胖 | 国产成人做爰A片免费软件牛牛 | 日本美女老少妇腿内射精区一区二 | 成人国产在线观看 | 亚洲精品久久久一二区三区蜜桃av | 国产精品嫩草AV城中村 | 国产在线一区二区三区免费播放 | 国产精品JIZZ在线观看免费 | 男子多次冒充员工参加年会被行拘 | 欧美精品久久久久久 | 蜜桃又黄又粗又爽av免 | 日韩不伦人妻无修正aV | 免费看A片AAA片三黄白浆 | 男女性爱视频无毒不卡久久久 | 强被迫伦轩高潮无BD | 午夜精品视频在线观看 | 国产成人无码一区二区三区 | 91精品国产一区二区 | 久6视频在线观看免费 | 极品国产在线观看 | 少妇久久久一品二品 | AV免费精品一区二区三区蜜桃 | 69久蜜桃人妻无码精品一区 | 国产高清一区二区三区 | 红桃视频一区二区三区四区 | 小黄书网站入口1 | 亚洲日产无码一二三区芒果 | 今天高清视频免费播放大全 | 特黄三级片少妇人妻久久 | 免费观看国产黄色AV大片 | 无码人妻精品一区二区蜜桃视频真实 | 黄的视频免费91 | 国产精品美女无遮挡一区二区 | 国产精品久久久午夜夜伦鲁鲁 | 超碰av导航手机 | 农村女人一级毛片农村↑妇女 | 亚洲AV无码国产精品色不卡 | 国产精品高潮呻吟久久久小说 | 亚洲激情图片一区二区 |